ETSI GS OEU 008: Operational energy Efficiency for Users (OEU); Global KPI for Information and Communication Technology Nodes |
---|
Name of Initiative/Methodology |
Operational energy Efficiency for Users (OEU); Global KPI for Information and Communication Technology Nodes
|
---|
Link to the latest published version |
ETSI GS OEU 008 (09/2013): Version 1.1.1
gs_OEU008v010101p.pdf
|
---|
Developed by
|
The European Telecommunications Standards Institute (ETSI) |
---|
History and Status |
- Work undertaken during 2013
- Published in September 2013
|
---|
Involved companies / parties |
- EADS
- Thales
- PSA Peugeot Citroen
- Orange SA
|
---|
Scope |
Organisation env. accounting
Scope 1 Scope 2 Scope 3
|
Product env. assessment
Life cycle approach
Use phase only
|
---|
GWP
Energy (focus on secondary energy)
|
KPIs
- Energy consumption
- Task efficiency
- Energy reuse
- Renewable energy
|
System(s) covered by the methodology |
Data centres or operator sites (ICT node operations)
|
---|
Goals |
- Improving energy usage and efficiency of an ICT node through a reduction in energy consumption, improvements in task efficiency, the re-use of energy and the contribution of renewable energy
- Providing methodological framework for the definition and calculation of Key Performance Indicators (KPI) in relation to the objectives described above (one global indicator + 4 objective indicators)
|
---|
Generic features |
- The indicators apply to systems of any size from initial operation to end of life
- The reduction in energy consumption and task efficiency are primary objectives
- Energy sources may be utility (from the grid), fossil or renewable local power sources, hydrothermal energy or aeraulics power source.
- The definition of task efficiency should specify the difference with “Power Usage Effectiveness” if relevant
|
---|
ICT-specific features |
The indicators apply to any buildings containing IT rooms, technical infrastructure and spaces required for proper operation of the data centre. Buildings containing offices for on-site employees are excluded.
|
---|
Examples of implementation / experience feedback |
None identified – to be filled later
|
---|
Interaction with other methodologies |
- [EN 50600] Information technology - Data centre facilities and infrastructures
- [ETSI OEU 001] Operational energy Efficiency for Users (OEU); Technical Global KPIs for Data Centres
- [EC Mandate M/462] Standardisation mandate addressed to CEN, CENELEC and ETSI to enable efficient energy use of ICT networks
- [ETSI ES 205 200] Access, Terminals, Transmission and Multiplexing (ATTM); Energy management; Global KPIs; Operational infrastructures
- [ETSI TS 105 174] Access, Terminals, Transmission and Multiplexing (ATTM); Broadband Deployment - Energy Efficiency and Key Performance Indicators
- EC DG JRC Code of Conduct for Data Centre Energy Efficiency
- EC DG JRC Code of Conduct on Energy Consumption of Broadband Equipment
- [Kyoto Protocol] to the United Nations Framework Convention on Climate Change
|
---|